| |
| ¡¡¡¡Home
¡ú Investment
Environment ¡ú
Completed Infrastructure |
Water
supply: The daily capacity of water supply
can amount to 30 thousand cubic meters; the water
quality can reach the national drinking water standards.
There are rich ground water resources.
Drainage: Divide the
rainwater and sewage in different channel, then
influx and treat the
Sewage: The sewage treatment plant is being built
now; the treatment capacity can amount to 50 thousand
cubic meters.
Road: The park has
roads net extend in all directions, the overall
length can amount to 56 kilometers, and percentage
of virescence coverage exceed 38%.
Electricity: A 110
KV substation has been set up in the park...
Communication: Cable
has been embedding under ground in advance, his
digital microwave, cable communication, wireless
beeper network, group exchange network, DDN broad
band system, ATM broad band system, ISDN narrow
band system, and internet can be in service now.
Cable TV connection:
the cable has been embedding under the ground in
advance.
Heating power: Haiyang
Yongping Thermal Power Plant, with total investment
of 250 million yuan, installed capacity of 24 thousand
KV, is building, and will supply heat and power
before the end of 2003.it can meet the demands of
the enterprises in the park.
Pipeline gas: pipeline gas supply project has finished
the prophase demonstration, now is practice performance.
Drain contamination:
Professional cleaning organization has been set
up in the park which is responsible for sanitation.
Land: Natural flat.
|
|
|
|